Serving Sherman and Grayson County City-registered contractor
(903) 209-2604

Our Process

How a Sherman job runs, step by step: free quote, written scope, written quote, sign-off - and the cheaper option named when there is one.

Sequence

Four steps, start to finish

Free inspection, the City registration and the $75 permit stated, then a written quote.

01

Call or message

Tell us the address and roughly when the roof went on. In this county the second answer matters more than usual: a roof that has been through two hail seasons is a different conversation from one that has been through eight.

02

Survey, on the roof and in the gutters

Bruising does not show from the ground, so the slopes get checked by hand. The soft metal -- vents, flashings, gutter aprons -- dents before shingles bruise, and granule loss in the gutters is the third piece of evidence. If the roof is fine, we will say so.

03

Written scope, then the price

Per square, with standard and Class 4 side by side rather than one recommendation. The City registration, the $75 permit and the nailing pattern all go in writing, and decking is priced per sheet.

04

The work, and the photographs

Permit pulled so the work is inspected, the site left clean and nails swept, and a before-and-after set that is yours whatever you decide to do next.

What it costs

All of it, priced

Published Grayson County ranges, with your written quote after the visit.

Before you hire anyone

"Licensed in Texas" describes something that does not exist

It is the most common reassurance offered in this market and it is hollow by construction. Here is what to ask instead.

01

Texas does not license roofing contractors

The Texas Department of Licensing and Regulation licenses electricians and HVAC technicians. It does not license roofers, and no other state body does either. So there is no license number to check, and a contractor offering one is describing something that does not exist.

02

City of Sherman registration is the thing that does

A roofing contractor working here must be registered with the City as a Roofing Contractor and must carry a $300,000 certificate of liability cover naming the City of Sherman as certificate holder. That is specific, local and checkable, and almost nobody asks about it.

03

The $75 permit is not a formality either

It is what gets the work inspected, which is the only independent confirmation you will ever get that the specification you paid for is the one that went on. A contractor who would rather skip it is telling you something.

04

And RCAT membership, if they have it

The Roofing Contractors Association of Texas runs a voluntary program. It is not a license and we will not pretend it is one -- but in a state that requires nothing, what somebody has volunteered for is more informative than what they were made to do.

Availability

Hail sets the calendar here, and it sets it for everybody at once

Worth knowing before you start ringing round, because the queue after a storm line is measured in weeks rather than days.

Roofs in Grayson County do not generally reach the end of their lives quietly. A hail line comes through, and several thousand roofs across the county are damaged in the same twenty minutes -- so every roofer within fifty miles takes those calls in the same week, and out-of-town crews arrive to work the storm. That is when the door-knocking starts and when the queue is longest.

The practical consequence is that the cheapest and fastest time to deal with a marginal roof is before a storm rather than after one. A survey booked in a quiet month gets a considered answer; the same call the week after a hail line gets whatever is available. If your roof has been through a season and nobody has looked at it, that is the visit worth booking now.

Want a number on it?

A free written quote, no obligation.

Call (903) 209-2604